Nexar I · Working prototype
Live demo
From a throw to a verified waste record, in 50 seconds.
Recorded with the working prototype in a test housing, November 2026. The throws play at 1.5× and the screen recordings at 2× speed.
Go to operations demoNexar I · Working prototype
From a throw to a verified waste record, in 50 seconds.
Recorded with the working prototype in a test housing, November 2026. The throws play at 1.5× and the screen recordings at 2× speed.
Go to operations demo